DRAFT
TM 5-4210-249-13&P-3
0452
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03318
3.
Connect foam probe wire harness connector (5) to foam probe connector (6).
4.
Install cover (3) to hose bed (4) with four washers (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator's panel housing (WP 0325)
2.
Close hose bed cover (WP 0015)
END OF TASK
END OF WORK PACKAGE
0452-3/(4 blank)