• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PUMP HOUSE HEATER DIAGNOSTIC MODULE REPLACEMENT - Continued
PUMP HOUSE HEATER DIAGNOSTIC MODULE REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  404    405    406    407    408  409  410    411    412    413    414  
img
DRAFT
TM 5-4210-249-13&P-3
0415
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT04653
8.
Remove nut (20) and switch (21) from box (4).
9.
Remove two screws (22), lockwashers (23), wire 4088 (24), and terminal (25) from switch (21). Discard
lockwashers.
10. Cut wire 4086 (26) and wire 4087 (27) (TM 9-2320-325-14&P).
11. Remove retainer (28) and indicator light (29) from box (4).
12. Remove grommet (30) and split loom (31) from box (4).
END OF TASK
INSTALLATION
NOTE
Install cable ties as required.
1.
Install split loom (31) and grommet (30) on box (4).
2.
Install indicator light (29) on box (4) with retainer (28).
3.
Repair wire 4087 (27) and wire 4086 (26) (TM 9-2320-325-14&P).
4.
Install terminal (25) and wire 4088 (24) on switch (21) with two lockwashers (23) and screws (22).
5.
Install switch (21) on box (4) with nut (20).
0415-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.