DRAFT
TM 5-4210-249-13&P-3
0386
INSTALLATION
1.
Install dual governor pressure switch (12) on power distribution box (8) with two screws (11), four
washers (10), and two locknuts (9).
2.
Close power distribution box (8) and tighten two screws (7).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT04455
3.
Connect pump operator's panel wire harness connector (6) to dual governor pressure switch connector (5).
4.
Connect main wire harness connector (4) to dual governor pressure switch connector (3).
5.
Connect pump operator's panel wire harness connector (2) to dual governor pressure switch power supply
connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Close pump operator's panel housing (WP 0325)
END OF TASK
END OF WORK PACKAGE
0386-3/(4 blank)