DRAFT
TM 5-4210-249-13&P-3
0375
INSTALLATION
TFFT1237
NOTE
All control valves are installed the same way. Ground sweeps "B" # 3 shown.
1.
Install three preformed packings (6), preformed packing (5), and valve (4) on manifold (7) with two washers (3)
and screws (2).
NOTE
Install cable ties as required.
2.
Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Connect batteries (TM 9-2320-325-14&P)
3.
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0375-2