DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
BLACKOUT RELAY REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Tool Kit, General Mechanic's: Automotive
WP 0615, Fig. 55
(WP 0622, Item 27)
Equipment Conditions
Materials/Parts
Personnel cab instrument panel A removed
Tags, Identification (WP 0625, Item 51)
Locknut (2)
REMOVAL
TFFT01605
1.
Remove two locknuts (1), washers (2), screws (3), and blackout relay (4) from instrument assembly (5).
Discard locknuts.
NOTE
Tag and mark wires prior to removal to ensure proper installation.
2.
Remove two screws (6), plates (7), and wires (8) from blackout relay (4).
3.
Remove two wires (9) from blackout relay (4).
END OF TASK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0369-1