DRAFT
TM 5-4210-249-13&P-3
0369
INSTALLATION
TFFT01605
1.
Install two wires (9) on blackout relay (4).
2.
Install two wires (8) on blackout relay (4) with two plates (7) and screws (6).
3.
Install blackout relay (4) on instrument assembly (5) with two screws (3), washers (2), and locknuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install personnel cab instrument panel A (WP 0311)
END OF TASK
END OF WORK PACKAGE
0369-2