DRAFT
TM 5-4210-249-13&P-3
0361
FOLLOW-ON MAINTENANCE
1.
120-Volt power cord installed in circuit breaker box (WP 0373)
2.
Install battery charger(s) receptacle if necessary (WP 0365)
3.
Install crew cab air conditioner/heater control box power cord if necessary (WP 0201)
4.
Install cord reel power cord if necessary (WP 0381)
5.
Install piping heat trace power cord if necessary (WP 0604)
6.
Install water tank heater power cord if necessary (WP 0300)
7.
Install 120-Volt receptacle if necessary (WP 0362)
END OF TASK
END OF WORK PACKAGE
0361-4