DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
120-VOLT POWER CORD(S) REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Equipment Conditions (continued)
Tool Kit, General Mechanic's: Automotive
Water tank heater power cord removed
(WP 0622, Item 27)
Piping heat trace power cord removed
Materials/Parts
(if necessary) (WP 0604)
Tags, Identification (WP 0625, Item 51)
Cord reel power cord removed
Ties, Cable, Plastic (WP 0625, Item 58)
Crew cab air conditioner/heater control box power
References
cord removed (if necessary) (WP 0201)
WP 0615, Fig. 75
Battery chargers(s) receptacle removed
Equipment Conditions
120-Volt power cord removed from circuit breaker
120-Volt receptacle removed
REPLACEMENT
NOTE
Tag and mark wires prior to removal to ensure proper installation.
Remove cable ties and cushion clips as required.
This procedure only shows routing of 120-volt power cords. It will never be necessary to
remove all 120-volt power cords at once.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0361-1