• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
120-VOLT RECEPTACLE REPLACEMENT - Continued
120-VOLT RECEPTACLE REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 3 Page Navigation
  230    231    232    233    234  235  236    237    238    239    240  
img
DRAFT
TM 5-4210-249-13&P-3
0362
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.
TFFT02811
4.
Install box (8) and receptacle (7) on rear body panel (5) with two screws (6).
5.
Install gasket (4) and receptacle cover (3) on rear body panel (5) with four washers (2) and screws (1).
END OF TASK
PUMP PANEL B RECEPTACLE REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02744
NOTE
Both pump panel receptacles are removed the same way. Driver side pump house panel
receptacle shown.
Tag and mark wires prior to removal to ensure proper installation.
1.
Remove four screws (1), receptacle cover (2), and gasket (3) from pump house panel B (4).
0362-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.