DRAFT
TM 5-4210-249-13&P-1
0094
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT03725
Step 25.
Open pump operator's panel housing (WP 0325). With a test lead set, check for
continuity across pump operator's panel wire harness wire 2816 (red) from main wire
harness pump operator's panel wire harness connector DO1, terminal D to pump
operator's panel FOAM SYSTEM switch, terminal.
a.
If there is continuity, repair wire 2816 in cab pump control wire harness
if repairable (TM 9-2320-325-14&P), or replace cab pump control wire
harness (WP 0443).
b.
If there is no continuity, repair wire 2816 in pump operator's panel wire
harness if repairable (TM 9-2320-325-14&P), or replace pump
operator's panel wire harness (WP 0459).
0094-19