• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GEAR UNIT AND MAIN SHAFT ASSEMBLY - Continued
GEAR UNIT AND MAIN SHAFT ASSEMBLY - Continued

Maintenance Manual for Firefighting Truck, 100 Ft Aerial Ladder, 1000 GPM Page Navigation
  302    303    304    305    306  307  308    309    310    311    312  
img
TM 5-4210-233-14&P-2
6-55. GEAR UNIT AND MAIN SHAFT ASSEMBLY - Continued
(18) Engage shaft of reamer and shaft assembly with pilot tool.
CAUTION
Keep reamer rotating at full drill speed when pulling back
through bushing.  If reamer is not rotating at full drill speed,
bushing could be damaged.
(19) Using 1/2-in. (13 mm) electric drill, machine bushing in approximately 75 to 150 rpm while adding
lubricating oil in bore at sides of sun gear shaft (9).
(20) Check inner diameter of bushings for runout. Runout must not exceed 0.002 in. (0.05 mm) total
indicator reading. Surface finish should be 30-microinch (0.762 micrometer).
(21) Thoroughly clean sun gear shaft (9) of chips and debris.
(22) bearing (10) on rear carrier assembly (11).
(23) Position rear carrier assembly (11) on transmission drum (12).
(24) Install retaining ring (13).
6-309


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.