Click here to make tpub.com your Home Page

Page Title: Chapter 1. INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-363-14&P
INTRODUCTION
Section I. GENERAL
1-4. Destruction of Materiel to Prevent Enemy Use.
1-1. Scope.
This manual is for your use in operating and maintaining
Refer to TM 750-244-1-5 for procedures to be used in
the AN/GSM-249 Fire Control Subsystem Test Set (the test
destruction of the test set to prevent use by the enemy.
set). The manual is divided into five chapters and three
appendixes. Chapter 1 describes the test set; Chapter 2
1-5. Calibration.
provides detailed theory of operation, and Chapter 3
provides  operating instructions. Chapter 4 provides
The digital multimeter in the test set is to be calibrated
maintenance instructions, and Chapter 5 provides final
periodically. These calibration instructions are contained in
inspection instructions. Appendix A is a list of references.
TB 9-4931-363-50.
Appendix B contains a Basic Issue Items List and Repair
Parts and Special Tools List. Appendix C is the
1-6. Quality Assurance/Quality Control (QA/QC).
Maintenance Allocation Chart.
There are no QA/QC requirements for the test set.
1-2. Maintenance Forms and Records.
1-7.  Reporting  Equipment
Improvement
Maintenance forms, records, and reports which are to be
Recommendations (EIRs).
used by maintenance personnel at all maintenance levels are
listed and prescribed in TM 38-750, The Army Maintenance
Management Systems (TAMMS).
EIRs will be prepared on DA Form 2407, Maintenance
Request. Instructions for preparing EIRs are provided in
1-3. Administrative Storage.
TM 38-750, The Army Maintenance Management System.
EIRs should be mailed directly to Commander, U.S. Army
Administrative storage  of the test set shall be
A r m a m e n t Materiel Readiness Command, ATTN:
accomplished in accordance with the provisions of TM
DRSAR-MAS, Rock Island, Illinois 61201. A reply will be
740-90-1.
furnished directly to you.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business