|
|
TM 9-4931-363-14&P
INTRODUCTION
Section I. GENERAL
1-1. Scope.
This manual is for your use in operating and maintaining
Refer to TM 750-244-1-5 for procedures to be used in
the AN/GSM-249 Fire Control Subsystem Test Set (the test
destruction of the test set to prevent use by the enemy.
set). The manual is divided into five chapters and three
1-5. Calibration.
provides detailed theory of operation, and Chapter 3
provides operating instructions. Chapter 4 provides
The digital multimeter in the test set is to be calibrated
maintenance instructions, and Chapter 5 provides final
periodically. These calibration instructions are contained in
inspection instructions. Appendix A is a list of references.
TB 9-4931-363-50.
Parts and Special Tools List. Appendix C is the
Maintenance Allocation Chart.
There are no QA/QC requirements for the test set.
1-7. Reporting Equipment
Improvement
Maintenance forms, records, and reports which are to be
Recommendations (EIRs).
used by maintenance personnel at all maintenance levels are
listed and prescribed in TM 38-750, The Army Maintenance
Management Systems (TAMMS).
EIRs will be prepared on DA Form 2407, Maintenance
Request. Instructions for preparing EIRs are provided in
TM 38-750, The Army Maintenance Management System.
EIRs should be mailed directly to Commander, U.S. Army
Administrative storage of the test set shall be
A r m a m e n t Materiel Readiness Command, ATTN:
accomplished in accordance with the provisions of TM
DRSAR-MAS, Rock Island, Illinois 61201. A reply will be
740-90-1.
furnished directly to you.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |