Click here to make tpub.com your Home Page

Page Title: Chapter 5. FINAL INSPECTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-363-14&P
FINAL INSPECTION
c. Inspect the test set container to insure that the clasp
5-1. General.
fasteners secure the lid firmly to the bottom section and
that the seal between the two sections is undamaged.
References to tests and procedures for final inspection
of the fire control subsystem test set after repairs have been
5-3. Other Components.
completed are provided in this chapter. If no deficiencies
In accordance with the procedures of paragraph 4-3,
are found, the test set is ready to be returned to the user or
inspect the LOD, the helmet boresight tool, the circuit card
to stock.
extractor, the connector shorting assembly, and the four
cables, all of which are stored in the lid of the test set
5-2. Test Set Subassembly.
container. Give special attention to the borescope angle
bracket of the LOD to insure that it is not bent or twisted
out of alignment.
a. V i s u a l l y i n s p e c t t h e t e s t s e t s u b a s s e m b l y i n
accordance with the procedures in paragraph 4-3.
5-4. Organizational HSS Boresight Kit.
Inspect in accordance with the procedures of paragraph
b. Perform the divider network adjustments (paragraph
4-23) and the test set self-test procedures (paragraph 3-6).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business