DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
CREW CAB ASSEMBLY REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
References
Crew Cab Lifting Fixture (WP 0622, Item 8)
WP 0614, Fig. 6
Standard Automotive Tool Set (SATS),
WP 0615, Fig. 51, 164
(WP 0622, Item 25)
Equipment Conditions
Tool Kit, General Mechanic's: Automotive
On-board tool mounting brackets removed
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Crew cab air conditioner coolant recovered
Ties, Cable, Plastic (WP 0625, Item 58)
(TB 9-2320-279-13)
Compound, Sealing (WP 0625, Item 17)
Batteries disconnected (TM 9-2320-325-14&P)
Lockwasher (1)
Air system drained (TM 9-2320-347-10)
Preformed Packing (1)
Right side splash guard removed
Preformed Packing (1)
(TM 9-2320-325-14&P)
Lockwasher (1)
Left side engine cover open and engine side
Locknut (2)
panel removed (TM 9-2320-325-14&P)
Locknut (2)
Driver side crew cab ladder removed (WP 0514)
Personnel Required
MOS 63B Wheeled vehicle mechanic (3)
REMOVAL
TFFT01422
NOTE
Tag and mark connectors, wires, and hoses prior to removal to ensure proper installation.
Remove cable ties as required.
1.
Disconnect three connectors (1), (2), and (3).
2.
Loosen two screws (4), and open compartment door (5).
0500-1