DRAFT
TM 5-4210-249-13&P-3
FIELD LEVEL MAINTENANCE
CAB POWER DISTRIBUTION WIRE HARNESS AND BLOCK REPLACEMENT
INITIAL SETUP:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tools and Special Tools
Equipment Conditions
Tool Kit, General Mechanic's: Automotive
Cab instrument panel assembly
(WP 0622, Item 27)
Cab power distribution block circuit breakers
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Cab power distribution block diode
Ties, Cable, Plastic (WP 0625, Item 58)
Lockwasher (3)
Cab power distribution block relays
Lockwasher (1)
Locknut (8)
References
TM 9-2320-325-14&P
WP 0615, Fig. 93
REMOVAL
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT03160
NOTE
Tag and mark wires prior to removal to ensure proper installation.
Note routing of cab power distribution wire harness prior to removal to ensure proper
installation.
Note position and remove cable ties, split loom, and cushion clips as required.
1.
Remove nut (1), lockwasher (2), and eight wires 1138 (3) from cab 24 VDC terminal block (4). Discard
lockwasher.
0441-1