DRAFT
TM 5-4210-249-13&P-3
0311
PANEL B INSTALLATION
1.
Install two foam tank selector switch indicators (10) on instrument panel B (2) (WP 0306).
2.
Install foam tank selector switch (9) on instrument panel B (2) (WP 0308).
3.
Install pump discharge pressure gauge (8) on instrument panel B (2) (WP 0317).
4.
Install three water and foam level gauges (7) on instrument panel B (2) (WP 0316).
5.
Install six cab panel indicators (6) on instrument panel B (2) (WP 0313).
6.
Install seven toggle switches (5) on instrument panel B (2) (WP 0315).
7.
Install instrument panel B (2) on instrument assembly frame (4) with five screws (3).
8.
Install siren control (1) on instrument panel B (2) (WP 0341).
END OF TASK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0311-9