DRAFT
TM 5-4210-249-13&P-3
0298
FOLLOW-ON MAINTENANCE
1.
Install foam tank fill port extensions and covers (WP 0293)
2.
3.
4.
5.
6.
Install pre-connect (WP 0577)
7.
8.
9.
10. Install foam level probes (WP 0281)
12. Install tank-to-pump check valve (passenger side) (WP 0296)
13. Install tank-to-pump check valve (driver side) (WP 0295)
14. Install water tank drain valve (WP 0279)
END OF TASK
END OF WORK PACKAGE
0298-10