DRAFT
TM 5-4210-249-13&P-2
0292
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT00157
7.
Install two couplings (3) and (4) on multi-metering valve (5) and two tees (6) and (7) (WP 0483).
8.
Install six air lines (1) on elbows (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house heater diagnostics module (WP 0415)
2.
Install pump house panel B (WP 0540)
END OF TASK
END OF WORK PACKAGE
0292-4