DRAFT
TM 5-4210-249-13&P-2
0288
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01054
5.
Install two air lines (9) and (10) on elbows (11) and (12).
6.
Install air line (7) on elbow (8).
7.
Connect six connectors (1), (2), (3), (4), (5), and (6).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump house panel A (WP 0539)
2.
Install pump house panel S (WP 0540)
END OF TASK
END OF WORK PACKAGE
0288-5/(6 blank)