DRAFT
TM 5-4210-249-13&P-1
0123
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT03881
Step 8.
Assemble and install water level probe (WP 0297). Connect water level probe
connector to pump operator's panel water level gauge, if removed. Turn battery
disconnect switch to ON position (WP 0007). Check if cab and pump operator's panel
WATER LEVEL gauges indicate correct water level in water tank.
a.
If gauges indicate correct water level in tank, fault has been corrected.
b.
If gauges do not indicate correct water level in tank, replace pump
operator's panel WATER LEVEL gauge (WP 0339).
0123-5