DRAFT
TM 5-4210-249-13&P-1
0098
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT03495
Step 13.
Remove pump house panel S (WP 0540). Put cab FOAM SYSTEM switch to off
Check air lines from FOAM A shutoff valve control manifold to foam system flow control
manifold for leaks, kinks, or damage.
If air lines are not free from leaks, kinks, or damage, replace damaged air
lines (WP 0567).
Step 14.
Check lines from ROOF TURRET FOAM A foam system flow control manifold to roof
turret foam A multi-metering valve cylinder for leaks, kinks, or damage.
If air lines are not free from leaks, kinks, or damage, replace damaged air
lines (WP 0567).
0098-12