• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FOAM NOT DELIVERED WHEN TANK B IS SELECTED (BUMPER TURRET, UNDER TRUCK NOZZLES, AND MANUAL METERING CONTROLS) - Continued
FOAM NOT DELIVERED WHEN TANK B IS SELECTED (BUMPER TURRET, UNDER TRUCK NOZZLES, AND MANUAL METERING CONTROLS) - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  519    520    521    522    523  524  525    526    527    528    529  
img
DRAFT
TM 5-4210-249-13&P-1
0096
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT04046
Step 22.
Remove pump house panel A (WP 0540). Remove driver side crew cab access
panel (WP 0499). Disconnect main wire harness valve control wire harness connector
DV1. With a test lead set, check for continuity across main wire harness wire 2200
(black) from main wire harness valve control wire harness connector DV1, terminal 18
to a known good ground.
a.
If there is continuity, repair wire 2200 in valve control wire harness if
repairable (TM 9-2320-325-14&P), or replace valve control wire
harness (WP 0463).
b.
If there is no continuity, repair wire 2200 in main wire harness if
repairable (TM 9-2320-325-14&P), or replace main wire
harness (WP 0455).
0096-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.