FOAM NOT DELIVERED WHEN TANK B IS SELECTED (BUMPER TURRET, UNDER TRUCK NOZZLES, AND MANUAL METERING CONTROLS) - Continued
FOAM NOT DELIVERED WHEN TANK B IS SELECTED (BUMPER TURRET, UNDER TRUCK NOZZLES, AND MANUAL METERING CONTROLS) - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 1 Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
.
DRAFT
TM 5-4210-249-13&P-1
0096
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT04416
NOTE
Ensure system air pressure is at least 85 psi (586 kPa) during this procedure. System air
pressure is required to activate valves.
Do not engage water pump engine during this procedure, except when performing
complete system checks. Valve operations can be checked without water pump
operation.
Valve operations can be checked by observing valve shaft rotation. Valves are open when
tabs or yellow paint tabs are aligned with direction of fluid flow.
Step 10.
Open pump house panel A (WP 0539). While an assistant puts and holds pump
operator's panel FOAM TANK switch to "B" position (WP 0004), check if foam B shutoff
valve operates to open position.
If foam B shutoff valve operates to open position, repair wire 2843 (red) in
main wire harness if repairable (TM 9-2320-325-14&P), or replace main wire
harness (WP 0455).