|
|
TM 5-4210-224-14&P
5-8. ENGINE REPLACEMENT. (Continued)
s. Connect oil cooler lines at the engine
h. Install the fan shroud (paragraph 4-74).
bolts (paragraph 4-74).
i. Install upper radiator hoses at the engine
t. Connect fuel return
lines
at
the
engine
j. Install the fan (paragraph 4-75).
u. Install engine wire harness (paragraph 4-183),
k. Position the harness and connect EGR-PGR
transmission cooler lines (paragraph 4-192), and
solenoids, glow plug controller, and temperature
front battery cable clamp at the oil pan.
sensor.
v. Connect block heater.
l. Connect wiring to rocker arm clips including
glow plug wires.
w. Install front and rear engine mounting bolts
m. Connect wiring at the injection pump (paragraph
x. Install
transmission
bell
housing
bolts
n. Connect ground cable at the alternator bracket
and alternator wires and clips (paragraph 4-
y. Position starter and install starter mounting
107).
bolts, and starter wires (paragraph 4-109).
o. Install fu l filter (paragraph 4-84) to cowl. Install
e
z. Connect exhaust pipes
at
the
the air cleaner (paragraph 4-83).
p. Fill the cooling system (paragraph 4-72).
aa. Install the flywheel cover bolts and remove the
transmission jack.
q. Install the hood (paragraph 4-148).
bb. Raise vehicle using jack, remove jack stands.
r. Raise vehicle using jack, install jack stands, and
Lower vehicle and remove jack.
lower vehicle.
cc. Reconnect battery cables.
5-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |