Click here to make tpub.com your Home Page

Page Title: STARTER REPLACEMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM5-4210-224-14&P
4-109. STARTER REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP:
Tools
General Safety Instructions
General Mechanics Tool Kit
Engine OFF
"S" Shaped Wrench
Transmission in (N) neutral.
Parking brake and micro-brakelock set.
Materials/Parts
Batteries disconnected.
Starter (1998442)
REMOVAL
NOTE
When disconnecting starter wires, take
note or mark wire leads appropriately for
proper installation.
a.
Disconnect all wires from terminals on starter
b.
Remove bolts (2), nuts (3), and washers (4)
which attach starter to engine.
c.
Pull starter (5) away from engine to remove.
NOTE
If any shims (6) are removed be sure they
are replaced.
d.
Torque starter nuts to 7.4 ft-lbs (10 N-m).
INSTALLATION
e.
Torque starter (short) bolts to 24 ft-lbs (32 N-
m).
a.
Position starter (5) against fly wheel housing.
f. Connect all wires to terminals on starter solenoid.
b.
Install bolts (2), nuts (3) and washers (4).
g.
Tighten all terminal nuts firmly. Torque the
c.
Torque starter (long) bolts to engine to 28 ft-
terminal nuts no more than 6 ft-lbs (8 N-m).
lbs (38 N-m).
h.
Reconnect battery cables.
4-153

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business