|
|
TM 9-1240-375-34&P
0073 00
TEST AND INSPECTION - Continued
Mount Rigidity Inspection
4
1
3
2
1 fc 4 7 2
1.
Set fire control quadrant (1) to zero mil.
2.
Place fire control quadrant (1) on inspection aid support assembly (2) and turn elevation handwheel (3)
until level bubble (4) in fire control quadrant centers.
NOTE
Cross-leveling fixture should be re-leveled in elevation and cant before checking zero
setting on elevation vernier scale.
5
6
1 fc 4 7 3
3.
Center bubble in cross level vial (5) and bubble in elevation level vial (6).
0073 00-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |