TM 9-1240-375-34&P
0009 00
FIRE CONTROL LEVEL ASSEMBLIES - Continued
Table 1. Troubleshooting Procedures - Continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Observe visually.
1. Contact RSO immediately.
4. ELEVATION LEVEL VIAL
(1) AND CROSS LEVEL
2. Perform wipe test under RSO
VIAL (2) HAVE NO
supervision.
BUBBLE AND ARE NOT
3. Remove, bag, and secure
ILLUMINATED.
device under RSO direction
and await wipe test results.
4. Howitzer should be secured
until wipe test results show
howitzer is not contaminated.
5. If contaminated, dispose of
device per RSO instructions.
6. If device is not contaminated,
replace elevation level vial
7. If device is not contaminated,
replace cross level vial
8. Dispose of replaced vial per
RSO instructions.
5. BUBBLE IN ELEVATION
Observe visually.
Adjust eccentric (WP 0051 00).
LEVEL VIAL (1) IS NOT
LEVEL.
END OF WORK PACKAGE