Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Quadrants
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

(f) Alternately  open  and  close  self-sealing  screw holes so one hole is open and other is closed every 15 min- utes. (g) Purge  until  humidity  indicator  is  blue.  During purge, lubricate self-sealing screw preformed packing light- ly with silicone compound. (h) Close  pressure  regulator  (CCW)  and  reinstall two self-sealing screws. (i) Remove  desiccant  cap  and  insert  new  desiccant from sealed package immediately into desiccant container. (j) Lubricate  preformed  packing  on  desiccant  cap lightly with grease or silicone compound and reinstall cap. Torque cap to 20 to 30 lb in. (2 to 3 Nm). (k) Slowly  open  regulator  valve  (CW)  and  charge lower section for 10 seconds to value given in ambient air temperature chart in para 3-10.q. (l) Close  nitrogen  tank  valve.  Remove  hose  and valve extension and install dust cap. r.  Periscope,  M981  Tank  (fig.  3-35).  Refer   to para 3-10.q.. for  procedures. 3-11.   Quadrants. a.  Quadrant,  M14  (fig.  3-36). Figure  3-36  M14  and  M14A1  Quadrants (1) Perform  purging  and  charging  procedure  para 2-5.b. (2) Purge instrument at 5 psig for 5 minutes. (3) Charge instrument at 1 psig for 10 seconds. (4) Leak  test  for  minimum  of  5  minutes. TM   750-116 c.  Quadrant,  M15  (figs.  3-37  and  3-38). NOTE For old configuration units, refer to figure 3-37. New configuration units are illustrated in figure 3-38. Figure  3-37  M15  Quadrant  -  Old  Configuration (1) Perform  purging  procedure  para  2-5.d. (2) Purge  instrument  at  5  psig  for  5  minutes. Figure  3-38  M15  Quadrant  -  New  Configuration b.  Quadrant,  M14A1  (fig.  3-36).  Refer  to  para 3-11.a. for procedures. 3-17

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business