Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Infrared Body Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   750-116 (3)  Infrared  Body  Assembly  (fig.  3-25). NOTE The infrared body assembly must be removed from  the  head  assembly  for  purging  and  charg- ing operations. Refer to appendix A for a list- ing  of  applicable  publications. NOTE: TWO VIEWS SHOWN FOR CLARITY Figure  3-25  M36  Infrared  Body  Assembly (a) 2-5.b. (b) (c) (d) Perform  purging  and  charging  procedure  para Purge instrument at 8 psig for 5 minutes. Charge instrument at 1 psig for 20 seconds. Leak test for a minimum of 5 minutes. (4) Passive  Elbow  Assembly  (fig.  3-26).   Re- fer to para 3-10.f.(3)  for  procedures. NOTE: TWO VIEWS SHOWN FOR CLARITY Figure  3-26  M36  Passive  Elbow  Assembly g.  Periscope,  M36E1  Tank  (figs.  3-23  through 3-26).  Refer to para  3-10.f.  for  procedures. h.  Tank  Periscope,  M42  Tank  (fig.  3-27). NOTE Early,  later,  and  modified  production  periscopes must be removed for purging and charging pro- cedures. Refer to appendix A for a listing of applicable   publications. (1)  Early  Production  (fig.  3-27). Figure 3-27 M42 Tank Periscope - Early Production (a) Perform  purging  procedure  para  2-5.d. (b) Purge instrument at 5 psig for 5 minutes. 3-12

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business