Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Periscope, M36 Tank
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 750-116 f. Periscope, M36 Tank (figs. 3-23 through 3-26). ENSURE THAT 1.5-OFF-24V SWITCH ON THE BOTTOM OF THE INFRARED BODY ASSEMBLY IS SET TO OFF; THIS UNIT CARRIES 16,000 VDC. Do not purge and charge the infrared body assembly in bright light; prolonged exposure can cause damage to the image conversion tube. NOTE The periscope must be removed from the in- stalled position for purging and charging opera- tions. Refer to appendix A for a listing of applicable publications. (1)  Head  Assembly  (fig.  3-23). (2) Daylight Body Assembly (fig. 3-24). NOTE The daylight body assembly and the infrared body assembly must be removed from the head assembly for purging and charging procedures. Refer to appendix A for a listing of applicable publications. Figure  3-24  M36  Daylight  Body  Assembly Figure  3-23  M36  Head  Assembly (a) Perform purging and charging procedure para (a) Perform  purging  and  charging  procedure  para 2-5.b. 2-5.b. (b) Purge instrument at 8 psig for 5 minutes. (b) Purge instrument at 8 psig for 5 minutes. (c) Charge instrument at 1 psig for 10 seconds. (C) Charge instrument at 1 psig for 20 seconds. (d) Leak test for minimum of 5 minutes. (d) Leak test for a minimum of 5 minutes. 3-11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business