TM 55-1925-292-14&P
0029 00
1
2
3
4
Figure 2. AFFF Pump Coupling Cover
4
2
1
3
Figure 3. AFFF Pump Coupling Detail
INSTALLATION
1. Thoroughly clean all old gasket material from the three flanges (figure 1, items 3, 6, and 9).
2. Use an endless sling and chain hoist to position the AFFF pump (figure 1, item 11) onto its foundation.
3. Loosely install the four bolts (figure 1, item 13), four new lockwashers (figure 1, item 14), and four flat washers
(figure 1, item 15) that secure the AFFF pump (figure 1, item 11) to its foundation.
0029 00-3
|