Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1925-292-14&P
0024 00
2. Remove the fire monitor (figure 1, item 4).
3. Remove and discard the gasket (figure 1, item 5) from the fire monitor flange (figure 1, item 3).
INSTALLATION
1. Thoroughly clean the fire monitor flange (figure 1, item 3).
2. Position a new gasket (figure 1, item 5) on the fire monitor flange (figure 1, item 3).
3. Position the fire monitor (figure 1, item 4) on the valve (figure 1, item 6) and secure it with the four bolts (figure 1,
item 1) and four nuts (figure 1, item 2).
4. Remove the lockouts and tagouts (FM 55-502).
5. Test the fire monitor (WP 0023 00), and observe that the fire monitor operates normally without leakage.
6. Return the equipment to the desired readiness condition.
END OF WORK PACKAGE
0024 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business