Click here to make tpub.com your Home Page

Page Title: PRESSURIZE FIRE MAIN
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1925-292-14&P
0005 00
c.
When the smoke has cleared, restart the ventilation supply fans in high speed.
d. When all smoke is cleared and air quality is at normal levels, return all ventilation fans to their normal
operating speed.
e. Ventilate the engine room for at least 15 minutes before proceeding to the cleanup phase.
4. After the engine room has been ventilated and has cooled down, wash down the engine room interior and all
equipment with fresh water.
NOTE
Bilge water which has been exposed to FM-200 fire extinguishing agent while
extinguishing a fire shall be classified and treated as hazardous waste.
5. Use the oily water collection system to remove all contaminated bilge water from the engine room. Discharge
this contaminated water only to a suitable treatment facility.
6. Return the equipment to the desired readiness condition.
PRESSURIZE FIRE MAIN
1. Align fire and general service pump no. 1 as the online fire and general service pump (TM 55-1925-273-10).
2. CLOSE valve FM-17, FIRE/G.S. PMP NO. 1 DISCH TO FM (figure 13, item 1).
3. OPEN valve FM-16, FIRE/G.S. PMP NO. 1 DISCH TO FM (figure 13, item 2).
2
1
Figure 13. Pressurize Fire Main
0005 00-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business