Click here to make tpub.com your Home Page

Page Title: PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR BOW THRUSTER COMPARTMENT FM-200 SYSTEM
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-251-24&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR BOW THRUSTER COMPARTMENT
FM-200 SYSTEM. The following identifies the PMCS required to maintain the Bow Thruster Room FM-200 system
in a fully operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Monthly
Pressure, FM-200
Crew
Check pressure gauges for proper
cylinders
operating pressure. If pressure gauge
indicator is not in green, submit Work
Order to General Support (GS)
Maintenance to have cylinder recharged.
2
Monthly
Liquid level, FM-200
Crew
Take liquid level readings in accordance
cylinders*
with instructions contained in Section II of
this document. If liquid level is low,
submit Work Order to General Support
(GS) Maintenance to have cylinder
recharged.
3
Monthly
Complete FM-200
Crew
Inspect system components in
System
accordance with instructions contained in
Section II of this document. If any
component is damaged, submit Work
Order to General Support (GS)
Maintenance.
4
Quarterly
Ventilation dampers
Crew
Verify proper operation of and service
Supply Damper and Exhaust Damper
5
Semi-Annually
FM-200 Pressure
Crew
Ensure diesel engine and powered
Switches
ventilation system shutdowns are in
operation. Manually raise plunger on
Pressure Switches. Confirm automatic
shutdown of operating engine and
ventilation system. Confirm activation of
Warning Light, Electric Horn/Strobe and
Warning Bell. Reset plunger on Pressure
Switches. If diesel engine or ventilation
system fails to shutdown automatically,
submit Work Order to General Support
(GS) Maintenance. If any Warning Lights,
Electric Horn/Strobe or Warning Bell fails
to operate, repair component.
6
Annually
Complete FM-200
General Support  Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
7
Post system
FM-200 piping and
General Support  Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing LSV-
5553-1.
8
Post system
Complete FM-200
General Support  Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Recertification.
* Note -
Refer to the Kidde Fire Systems FM-200 ECS Series Engineered Design, Installation, Operation
and Maintenance Manual for Marine FM-200 Systems (This document is provided at Section II) for temperature
correction charts.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business