Click here to make tpub.com your Home Page

Page Title: PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-251-24&P
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR EMERGENCY GENERATOR ROOM
FM-200 SYSTEM. The following identifies the PMCS required to maintain the Emergency Generator Room FM-
200 system in a fully operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Monthly
Pressure, FM-200
Crew
Check pressure gauge for proper
cylinder
operating pressure. If pressure gauge
indicator is not in green, submit Work
Order to General Support (GS) Maint.
to have cylinder recharged.
2
Monthly
Complete FM-200
Crew
Inspect system components in
System
accordance with instructions contained
in Section II of this document. If any
component is damaged, submit Work
Order to General Support (GS) Maint.
3
Quarterly
Ventilation Damper
Crew
Verify proper operation and service
Emergency Generator Room Supply Air
Damper.
4
Quarterly
Ventilation Covers
Crew
Install three (3) ventilation covers (Stbd.
Mooring Station). Verify fit and service
securements.
5
Semi-Annually
FM-200 Pressure
Crew
Ensure diesel engine and powered
Switches
ventilation system shutdowns are in
operation. Manually raise plunger on
Pressure Switches. Confirm automatic
shutdown of diesel engine and
ventilation system. Confirm activation
of Warning Light, Electric Horn/Strobe,
and Warning Bell. Reset plunger on
Pressure Switches. If diesel engine or
ventilation system fail to shutdown
automatically, submit Work Order to
General Support (GS) Maintenance. If
Warning Light, Electric Horn/Strobe, or
Warning Bell fails to operate, repair
component.
6
Annually
Complete FM-200
General Support
Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
7
Post system
FM-200 piping and
General Support
Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing
LSV-1-5553-1.
8
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Recertification.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business