![]() TM 55-1915-251-24&P
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
7
Annually
Complete FM-200
General Support
Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
8
Post system
FM-200 piping and
General Support
Perform test of FM-200 piping and
disassembly
distribution system
distribution system per testing
requirements identified on Drawing LSV-
1-5553-1.
9
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative and
request System Recertification.
* Note -
Refer to the Kidde Fire Systems FM-200 ECS Series Engineered Design, Installation, Operation
and Maintenance Manual for Marine FM-200 Systems for temperature correction charts.
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) FOR PAINT LOCKER FM-200 SYSTEM. The
following identifies the PMCS required to maintain the Paint Locker FM-200 system in a fully operational condition:
Item
Maintenance
No.
Interval
Item to be Inspected
Level
Procedure
1
Monthly
Pressure, FM-200
Crew
Check pressure gauge for proper
cylinder
operating pressure. If pressure gauge
indicator is not in green, submit Work
Order to General Support (GS)
Maintenance to have cylinder recharged.
2
Monthly
Complete FM-200
Crew
Inspect system components in
System
accordance with instructions contained in
Section II of this document. If any
component is damaged, submit Work
Order to General Support (GS)
Maintenance.
3
Semi-Annually
FM-200 Pressure
Crew
Ensure powered ventilation system
Switch
shutdown is in operation. Manually raise
plunger on Pressure Switch. Confirm
automatic shutdown of ventilation
system. Confirm activation of Warning
Bell. Reset plunger on Pressure Switch.
If ventilation system fails to operate,
summit work order to General Support
(GS) Maintenance. If Warning Bell fails
to operate, repair Warning Bell.
4
Annually
Complete FM-200
General Support
Obtain services of Manufacturer's
system
Certified Technical Representative and
perform Annual Recertification.
5
Post system
FM-200 piping and
General Support
Test piping and distribution system per
disassembly
distribution system
testing requirements identified on
Drawing LSV-1-5553-1
6
Post system
Complete FM-200
General Support
Obtain services of Manufacturer's
activation
system
Certified Technical Representative to
perform System Recertification.
2
|
|