DRAFT
TM 5-4210-249-13&P-4
0588
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01621
1.
Position drain pan under hydraulic hose (1).
2.
Remove plug (2) from hydraulic hose (1) and drain hydraulic oil completely.
3.
Install plug (2) on hydraulic hose (1).
END OF TASK
FILL
1.
Remove breather cap (3) from hydraulic reservoir (4).
NOTE
Use clean funnel to transfer hydraulic oil into hydraulic reservoir.
2.
Fill hydraulic reservoir (4) until hydraulic oil level reaches full mark on sight glass (5).
3.
Install breather cap (3) on hydraulic reservoir (4).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect batteries (TM 9-2320-325-14&P)
2.
END OF TASK
END OF WORK PACKAGE
0588-2