DRAFT
TM 5-4210-249-13&P-3
0540
PUMP PANEL L INSTALLATION
TFFT00236
1.
Install rubber guard (26) on pump panel L (5).
2.
Install three decal plates (25) on pump panel L (5) (WP 0518).
3.
Install pump panel L (5) on vehicle with three washers (24), lockwashers (23), and screws (22).
4.
Install box (21) and receptacle (19) on pump panel L (5) with screw (20).
5.
Install receptacle (19) on pump panel L (5) with washer (18) and screw (17).
6.
Install gasket (16) and receptacle cover (15) on pump panel L (5) with four washers (14) and screws (13).
7.
Install two gaskets (12) and cover plates (11) on pump panel L (5) with eight washers (10) and screws (9).
8.
Install two couplings (7) on passenger side discharge pipes (8).
9.
10. Install two clips (4) on pump panel L (5) with two washers (3), lockwashers (2), and screws (1).
END OF TASK
0540-19