DRAFT
TM 5-4210-249-13&P-3
0312
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01623
18. Connect connector (7).
19. Install two wires (4) and (3) on two studs (6) and (5) with two nuts (2) and (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Install personnel cab instrument panels D and E (WP 0311)
3.
END OF TASK
END OF WORK PACKAGE
0312-7/(8 blank)