DRAFT
TM 5-4210-249-13&P-3
0313
INSTALLATION
TFFT01275
NOTE
All indicators are installed the same way.
1.
Install indicator (3) on instrument panel (4).
2.
Install two wires (1) and (2) on indicator (3).
END OF TASK
FOLLOW-ON MAINTENANCE
Install personnel cab instrument panel C (WP 0311)
END OF TASK
END OF WORK PACKAGE
0313-2