DRAFT
TM 5-4210-249-13&P-3
0305
INSTALLATION
TFFT01279
1.
Pull connector (5) through indicator guard (3).
2.
Connect connector (5) on indicator (2).
3.
Install indicator guard (3) and indicator (2) on panel (4) with two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0305-2