DRAFT
TM 5-4210-249-13&P-2
0281
INSTALLATION
TFFT01082
NOTE
Both foam probes are installed the same way.
Ensure vent tube, vent tube hole in gasket, and vent tube hole in tank are aligned.
1.
2.
Install gasket (9) and foam level probe (8) on tank (10) with four screws (7).
NOTE
Install cable ties as required.
3.
Connect connector (6) and install heat shrink (5).
NOTE
Perform Step (3) to install foam level probe cover.
4.
Install cover (3) on hose bed (4) with four screws (1) and washers (2).
END OF TASK
FOLLOW-ON MAINTENANCE
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
0281-2