DRAFT
TM 5-4210-249-13&P-2
0221
15. Install hose (17) on duct (18) with clamp (16).
16. Install hose (14) on elbow (15).
17. Install duct (4) on union (13) with clamp (12).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT01802
18. Install clamp (10) on bracket (11) with locknut (9).
19. Install union (7) on turbocharger intake (8) with clamp (6).
20. Install elbow (3) on ducts (5) and (4) with two clamps (2) and (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump house panel A (WP 0539)
2.
Install pump house panels S and U (WP 0540)
3.
Close pump operator's panel housing (WP 0325)
END OF TASK
END OF WORK PACKAGE
0221-7/(8 blank)