DRAFT
TM 5-4210-249-13&P-2
0219
FOLLOW-ON MAINTENANCE
1.
Fill and check water pump engine oil (LO 9-2320-379-12)
2.
3.
Install pump house panels B, K, L, N, O, and Q (WP 0540)
4.
Install auxiliary inlet valve (passenger side) (WP 0294)
5.
Install extendable floodlight (WP 0354)
6.
Install water pump engine exhaust pipes (WP 0228)
7.
Install water pump engine air cleaner assembly (WP 0220)
8.
Install water pump engine air filter ducting (WP 0221)
9.
END OF TASK
END OF WORK PACKAGE
0219-50