• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CREW CAB AIR CONDITIONER/HEATER CONTROL BOX REPLACEMENT - Continued
CREW CAB AIR CONDITIONER/HEATER CONTROL BOX REPLACEMENT - Continued

Maintenance Manual For Tactical Fire Fighting Truck (Tfft) Model M1142 - 2 Page Navigation
  864    865    866    867    868  869  870    871    872    873    874  
img
DRAFT
TM 5-4210-249-13&P-2
0201
CIRCUIT BREAKER REMOVAL
TFFT01797
NOTE
Tag and mark wires prior to removal to ensure proper installation.
Remove cable ties as required.
1.
Remove four locknuts (1), washers (2), wires (3), and bus bar (4) from two circuit breakers (5) and (6).
Discard locknuts.
2.
Remove locknut (7) and two circuit breakers (5) and (6) from control box (8). Discard locknut.
END OF TASK
CIRCUIT BREAKER INSTALLATION
NOTE
Install cable ties as required.
1.
Install two circuit breakers (5) and (6) in control box (8) with locknut (7).
2.
Install bus bar (4) and four wires (3) on two circuit breakers (5) and (6) with four washers (2) and locknuts (1).
END OF TASK
0201-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.