DRAFT
TM 5-4210-249-13&P-1
0118
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT03436
Step 10.
Install circuit breaker P7 (WP 0412). Open pump operator's panel housing (WP 0539).
Disconnect pump operator's panel wire harness TANK FILL & RE-CIRCULATING LINE
valve control connector. Turn battery disconnect switch to ON position (WP 0007).
Check for 22 to 28 VDC between pump operator's panel wire harness wire 4083 (green)
at TANK FILL & RE-CIRCULATING LINE valve control connector, terminal A and a
known good ground.
If 22 to 28 VDC are not present, go to Step 12.
Step 11.
Turn battery disconnect switch to OFF position (WP 0007). Check for continuity across
wire 3895 (black) from pump operator's panel TANK FILL & RE-CIRCULATING LINE
valve control connector, terminal B and a known good ground.
a.
If there is continuity, replace TANK FILL & RE-CIRCULATING LINE
valve control (WP 0418).
b.
If there is no continuity, repair wire 3895 in pump operator's panel wire
harness if repairable (TM 9-2320-325-14&P), or replace pump
operator's panel wire harness (WP 0459).
0118-11