DRAFT
TM 5-4210-249-13&P-1
0111
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT0670
Step 20.
Turn battery disconnect switch to OFF position (WP 0007). Disconnect pump
operator's panel wire harness pump house power distribution wire harness connector
DP2. Turn battery disconnect switch to ON position (WP 0007). With a test lead set,
check for 22 to 28 VDC between pump house power distribution wire harness wire 4079
(yellow) at connector DP2, terminal C and a known good ground.
a.
If 22 to 28 VDC are present, repair wire 4079 in pump house wire
harness if repairable (TM 9-2320-325-14&P), or replace pump
operator's panel wire harness (WP 0459).
b.
If 22 to 28 VDC are not present, repair wire 4079 in pump house power
distribution wire harness if repairable (TM 9-2320-325-14&P), or
replace pump house power distribution wire harness and block
(WP 0457).
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0111-17/(18 blank)