DRAFT
TM 5-4210-249-13&P-1
0106
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TFFT03426
Step 15.
Disconnect pump house wire harness pump house power distribution wire harness
connector DP2. With a test lead set, check for 22 to 28 VDC between pump house
power distribution wire harness wire 4082 (gray) at connector DP2, terminal M and a
known good ground.
a.
If 22 to 28 VDC are not present, repair wire 4082 in pump house power
distribution wire harness if repairable (TM 9-2320-325-14&P), or
replace pump house power distribution wire harness and block
(WP 0457).
b.
If 22 to 28 VDC are not present, repair wire 4082 (gray) in pump house
wire harness if repairable (TM 9-2320-325-14&P), or replace pump
house wire harness (WP 0458).
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
0106-12