DRAFT
TM 5-4210-249-13&P-1
0019
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02249
NOTE
Perform Steps (4) through (7) if pump operator's panel gauges are not able to be read due
to sunlight or other weather condition.
4.
Pull handle (2) towards crew cab (4) to make pump panel cover (3) flat.
5.
Lift up on handle (2).
6.
Remove two support rods (5) from support rod catches (6).
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TFFT02252
7.
Install two support rods (5) in holes (7) on pump operator's panel cover (3).
END OF TASK
0019-2