TM 5-4210-233-14&P-2
SECTION II MAINTENANCE ALLOCATION CHART
MAINTENANCE ALLOCATION CHART
NOMENCLATURE OF END ITEMS: TRUCK, 100 FT. AERIAL LADDER
(1)
(2)
(3)
(4) MAINTENANCE LEVEL
(5)
(6)
DIRECTGENERAL
GROUP
COMPONENT/
MAINT.
UNIT
SUPPORTSUPPORTDEPOTTOOLS &
NO.
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIP.
REMARKS
04
PUMP, PIPING SYSTEM, AND VALVES
(Continued)
FRONT SUCTION ASSEMBLY
Replace
12.0
1, 4
FIRE PUMP
Inspect
.25
Test
1.0
Replace
40.0
1, 4
Repair
8.0
1, 4
OPERATING RODS
Replace
1.5
1
RELIEF VALVE
Replace
2.0
1
Repair
2.0
1
DISCHARGE CONNECTIONS/CHROME
Inspect
.10
ADAPTERS
Replace
.50
1
PRE-PLUMBING
Replace
5.0
PRIMING PUMP
Inspect
.25
Replace
2.0
1
Repair
3.5
1
PRIMING PUMP MOTOR
Replace
2.0
1
PRIMING PUMP TUBING
Inspect
.10
Replace
.50
1
PRIMING PUMP OIL TANK
Inspect
.10
Service
.25
Replace
.50
1
05
HOSE BODY ASSEMBLY
Inspect
1.50
REAR STROBE LIGHT
Inspect
.10
Repair
.50
1
Replace
.50
1
REAR STROBE LIGHT POWER SUPPLY
Inspect
.10
1
Replace
1.0
B-9